11/4/200511/06/2004
Gemba Solutions: Tel: +44 (0)1455 222060, Web: www.oeeimpact.co.uk
PRODUCTIVITY IMPROVEMENTS COME AS STANDARD
What is OEE
OEE = Availability (B/A) X Performance (D/C) X Quality (F/E)
Planned Shift = 480min
A      Planned Machine Production Time = 420min
B      Actual Running Time = 373min
C      Theoretical Machine Production Rate = 22,380
D      Actual Production Rate = 19,271
E      Pieces Produced = 19,271
F      Good Parts = 18,848
Planned Idle
Stoppages
Speed Loss
Wastage
OEE IMPACT
Product Programmable
(88.8%)
(86.1%)
(97.8%)
OEE = Availability x Performance x Quality  = 88.8 x 86.1 x 97.8 = 74.8%